所屬欄目:水電工程水情自動(dòng)測(cè)報(bào)系統(tǒng)
4.1.1 General design for the hydrological telemetry systemshall be conducted at the feasibility study stage of a HPP, and ageneral design report shall be separately prepared.4.1.2 The general design of the system shall cover thefollowings.(1) Collecting a ......(本文共 1931 字 ) [閱讀本文] >>